BizTalk Server Applications Integration - Passing Processing Instructions between K2 and BizTalk

This is Interesting: Free IT Magazines  
Home > Archive > BizTalk Server Applications Integration > May 2005 > Passing Processing Instructions between K2 and BizTalk





You are viewing an archived Text-only version of the thread. To view this thread in it's original format and/or if you want to reply to this thread please [click here]

Author Passing Processing Instructions between K2 and BizTalk
Ellen Deak

2005-05-10, 5:55 pm

I'm having trouble returning information from a BizTalk orchestration back to
the K2 process that initiated it.

In my K2 process, I'm using the BTS_Orchestration Event. In the Event
properties, I've set the Message Xpath to the root of the xml fields I've
defined for the K2 process and checked the "Copy XML Processing Instructions"
box.

The K2 documentation says this is supposed to embed the Serial Number in the
message as Processing Instructions. Then, we are supposed to preserve the
Processing Instructions in BizTalk. I'm not sure how to "preserve the
Processing Instructions". I don't see any way of getting that Serial Number
from inside BizTalk in order to use it for anything.

Has anybody on this forum done K2/BizTalk integration yet? Can anybody
explain how to do this?

Thanks,
--
Ellen Deak
Ellen Deak

2005-05-18, 5:59 pm

I found the answer to this elsewhere. In BizTalk open up the map. Click the
map surface and look at the properties. There is a property called "Copy
Processing Instructions" that needs to be set to "yes".
--
Ellen Deak

Sponsored Links






Free braindumps | Software forum | Database administration forum

Copyright 2003 - 2008 webservertalk.com