I having this problem with backups using Ghost 9. For some reason it keeps
wanting to do only baseline backups and not incrementals (which are much
smaller).
I have noticed that if I dont turn of the PC between backups that it seems
then to do an incremental. But if I power off between backups it will
continue to do the full 44G backup.

I have Windows XP-sp2 and have the latest Ghost updates installed. I have a
schedule of once a month baseline and a incremental once each day
thereafter.

Does the power off thing bring any clues to mind of something that I can to
do to fix it? I did a FAQ that said if you defrag or make a lot of changes
it will do a baseline. But niether are the case here.

Thanks!
..


#! rnews 1285
Xref: xyzzy comp.sys.ibm.pc.hardware.storage:268303
Newsgroups: comp.sys.ibm.pc.hardware.storage
Path: xyzzy!nntp
From: "JJonson" <jj@yahoo.com>
Subject: Ghost 9 wont do incrementals..why?
X-Nntp-Posting-Host: anc68cp221.sw.nos.boeing.com
Message-ID: <IDIuMG.Lys@news.boeing.com>
X-Mimeole: Produced By Microsoft MimeOLE V6.00.2800.1441
X-Priority: 3
X-Msmail-Priority: Normal
Lines: 19
Sender: nntp@news.boeing.com (Boeing NNTP News Access)
Organization: The Boeing Company
X-Newsreader: Microsoft Outlook Express 6.00.2800.1437
Date: Fri, 18 Mar 2005 00:27:53 GMT

I having this problem with backups using Ghost 9. For some reason it keeps
wanting to do only baseline backups and not incrementals (which are much
smaller).
I have noticed that if I dont turn of the PC between backups that it seems
then to do an incremental. But if I power off between backups it will
continue to do the full 44G backup.

I have Windows XP-sp2 and have the latest Ghost updates installed. I have a
schedule of once a month baseline and a incremental once each day
thereafter.

Does the power off thing bring any clues to mind of something that I can to
do to fix it? I did a FAQ that said if you defrag or make a lot of changes
it will do a baseline. But niether are the case here.